First, before starting the installation, it's essential to level the ground properly. If you're using cement mortar for leveling, make sure the moisture content of the base layer doesn't exceed 15%. It's also recommended to install the subfloor first to ensure a stable base and avoid any issues that might affect the final floor installation.
Once the flooring material arrives at the site, it should be unpacked and stored indoors for at least a week. This allows the wood to acclimate to the room’s temperature and humidity, which is crucial for preventing future warping or shrinking after installation.
It's best to avoid installing the floor during rainy or humid weather. Keep the indoor environment as stable as possible in terms of temperature and humidity throughout the process. Sudden changes can negatively impact the performance and longevity of the wooden floor.
All the flooring in the same room should be laid in one go to maintain consistency in appearance and quality. After installation, protect the finished surface from stains caused by oil, fruit juice, or other substances. Any excess adhesive that comes out during the process should be cleaned up immediately to keep the floor looking clean and professional.
To account for natural expansion and contraction due to temperature and humidity changes, leave a gap around the edges. For engineered flooring, a gap of about 1.2 cm is recommended, while solid wood floors should have a 1 cm gap. These gaps help prevent buckling or damage over time.
(Word count: 512)Calender Reducer,Calender Gearbox Reducer,Plastic Calender Machine Gearbox,Calender Gear Box Reducer
JIANGYIN TIANCHENG MECHANICAL EQUIPMENT CO., LTD. , https://www.gearboxjc.com