Beijing builds subways to check the quality of waterproofing projects to increase penalties

Violation of regulations and penalties

The Municipal Housing and Construction Committee stated that the inspection includes the qualifications and qualifications of professional subcontractors for waterproofing projects, sampling inspection of waterproof materials, inspection of waterproof construction quality and protection of finished products, supervision of waterproof construction by supervision units, and so on. For violations of laws and regulations found in inspections, administrative processing and penalties will be increased, and enterprises and personnel will be dynamically supervised and managed.

Beijing is raining this summer, and Beijing's downtown area has been tested for its ability to defend against flooding. The reporter found that the investigation (reported on September 26th in this paper) revealed that large-scale leakage of water was also found in the subway as an important public transport, and the most serious problem was the No. 10 line.

22 stations only two stations do not leak water

In the rainy season this year, some netizens announced photos of the water leakage on Subway Line 10.

During the flood season this year, the reporter visited the stations of the Metro Line 10 three times to investigate the water leakage in the subway.

After a rainy morning in the early morning of September 1, the reporter visited the stations of the Metro Line 10 and looked at the entire site of Line 10 from Bagou to Jinsong. 20 stations out of 22 stations had different degrees of leakage.

Among the subway stations that leaked water, the leakage at Zhichun Road Station was the most serious.

Release date:2011/11/14 16:51:23

PVC Ceiling

Film Faced Plywood,Bedroom Furniture,Cabinet Door Co., Ltd. , http://www.nsplywoods.com

Posted on