The 4 key parts of the place where the new house decoration must be checked must be carefully examined

Renovation is a professionally demanding thing. I believe besides my friends who are engaged in interior design work, most of them will be directly handed over to the decoration company after they have bought the house. Even if they want to supervise the work, they do not know where to start, so today , Xiao Bian to inventory several new home renovation must check the place .

1, leveling

Due to the construction techniques and experience of the decoration master, when the ground decoration is performed, one or more problems often occur. The lack of smoothness is usually the most common phenomenon. Therefore, leveling has become a new house decoration. The first place in the place must be checked. This work is very simple to do, just by visual inspection plus touch by hand. However, one thing that needs special attention is that most of the decoration companies generally require the owner to not need leveling at the end of the renovation. If the owner proposes to do so, they will also need to pay the corresponding fees. This is an unreasonable fee. Because, in fact, the entire renovation process already covered the leveling process. Therefore, it is recommended that everyone should understand this issue clearly when signing a construction agreement with the decoration company in the early stage and avoid extra expenses.

2, tile laying

In addition to leveling, there is a key area where new home renovations must be checked, that is, tiles. Often, some owners find the decoration company complaining about improper bulging or partial rupture of the floor tile after they have checked in. However, not to mention that the decoration fee has already been paid, and the renovation time has exceeded the time. The decoration company often refuses. Make compensation or free trimming service. Therefore, to remind all friends who are in need of renovation, be sure to bring a small raft before clearing the various expenses, carefully tap, check the room, living room, restaurant, bathroom, etc. Every place tile is qualified, if the sound is crisp , then there is a problem, it is best to immediately recall the construction team, re-paving.

3, wall painting process

Checking the place where new home renovations must be inspected naturally cannot be the key to this wall. Assuming that the workers are not operating properly, there are obvious color differences, rough walls, and severe wall peeling. Therefore, it is very necessary to strictly supervise the brushing techniques of workers.

4, slotting

People who have experienced renovations know that there are usually steps in the installation of electric wires to slot the floor or wall. If this step is blindly pursued for efficiency, it will affect the beauty and practicality of the groove, so this It is also the place where new house decoration must be checked.

Xiaobian conclusion: After the article is described, I believe we have a general understanding of the place where the new house decoration must be checked , but in fact, there are still many very small issues in the process of renovation must also be paid attention to, so remind everyone Be sure to look at professional knowledge and supervise the work.

 

Our Pipe Elbow is made from a variety of materials, such as alloy steel, stainless steel, etc, and the materials used depend on the function of the piping unit. It is a bent at an angle to allow straight pipes to be joint at an angle, there by realizing a change of direction. Of all pipe fittings, pipe elbow is the most widely used one, which is used in a variety of applications in industries such as electrical power, marine, heating, papermaking, metalurgy, petrochemical, chemical, oil and gas, and more.

Range : 1/2"NB TO 48"NB IN SCH: 20, 30, 40s, 80s, 10, 20, 40, STD, 60, 80, XS, 100, 120, 140, 160, XXS available with NACE MR 01-75

Type : SEAMLESS / WELDED/ FABRICATED
Form :
» Elbows in Long & Short Radius in 45 deg, 90 deg, 180 deg.
» Equal, Unequal Tee & Barred Tee .
» Eccentric Reducer & Concentric Reducer
» Caps & Crosses.
» Long & Short Stub End.
» Swage Nipple & Barrel Nipple.
Standard : ASTM / ASME A/SA 234
Grade : WP 1, WP 5, WP 9, WP 11, WP 12, WP 22, WP 23, WP 91
Value Added Services:
» Hot Dipped Galvanizing
» Sand Blasting

Alloy Steel Pipe Fitting

Alloy Steel Pipe Fitting,Alloy Steel Fitting,Sr Elbow,Alloy Steel Seamless Elbow Fittings

Shijiazhuang Bang dong Pipeline Technology Co,Ltd. , https://www.bd-pipefitting.com

Posted on